Overview: Architects
Architect is a title protected by law. Only people on the statutory register may use it, and the register is public, so check the name before you check the portfolio. Chartered membership of a professional institute is an additional thing, not the same thing, and plenty of good building designers are not architects at all.
Work is normally described by the stages of the RIBA plan of work, running from the brief through concept and technical design to construction and handover. Agree which stages you are appointing for. Many owners buy the early stages, get consent, then decide about the rest.
Two approvals are needed and people constantly confuse them. Planning permission is the council deciding whether you may build what you propose, and it takes a view on appearance, scale and impact on neighbours. Building regulations govern how it is built, and building control signs that off separately. A conservation area or a listed building adds further consent.
In England and Wales, work near a boundary may trigger a party wall notice. Use the region and town lists below.
Architect costs in the UK
Start with the stage you need: early advice, planning drawings, technical drawings or a full architectural appointment. Compare the agreed deliverables and fee basis before adding any project costs together.
| Job or service | Guide price | Scope |
|---|---|---|
| Early advice and feasibility design time | £110–£180per architect-hour | Time-based advice, design exploration or feasibility work for a domestic project, with the number of hours agreed in advance.This is an hourly rate, not the total for a feasibility study. Agree a time allowance or spending cap.Included and extra costsIncluded: Architectural advice or design time; Agreed record of findings or design work Extra or separately priced: Measured survey unless agreed; Third-party reports and application charges |
| Planning drawings and application submission | £790–£3,600per small-extension package | Architectural planning drawings and submission management for a small, standard domestic extension, using suitable existing property information and an agreed brief.The lower end is a remote drawing package. Ask how much design development, measured information and revision work the fee includes.Included and extra costsIncluded: Planning drawing set; Application submission and agreed revisions Extra or separately priced: Measured survey and council application fee; Technical drawings and specialist reports |
| Building regulations or building warrant drawings | £900–£5,000per domestic-extension package | Architectural technical drawings for a domestic extension whose design is already agreed, using an adequate measured base and separately commissioned engineering where required.Drawing-only and fully coordinated packages differ considerably. Confirm submission support and the detail your builder will receive.Included and extra costsIncluded: Technical architectural drawings; Agreed construction details and specifications Extra or separately priced: Structural engineering and specialist reports; Approval charges and construction-stage visits |
| Full architectural appointment for an existing home | 14%–17%of construction cost before VAT | Design, planning, technical work, tender support and construction contract administration for an ordinary home extension or refurbishment with a £100,000–£500,000 net construction budget.Alternative to separate stage fees; the appointment includes the design, planning and technical work described. VAT on the architect’s fee is included in this percentage. Apply it to the agreed construction cost excluding VAT.Included and extra costsIncluded: Agreed architectural design and approval stages; Tender support and contract administration; Scheduled site inspections and completion work Extra or separately priced: Other consultants, surveys and statutory charges; Daily site supervision and client-requested extra services |
| Changes outside the agreed brief | £125–£180per hour | Extra design time approved after the revision allowance has been used.Included and extra costsIncluded: Agreed additional design work Extra or separately priced: Third-party fees; Unlimited revisions |
What changes the price?
- Stages and deliverables. A planning drawing set, detailed construction package and full appointment cover different amounts of design and support.
- Existing building and approvals. Listed status, difficult structures, uncertain measurements and specialist planning reports add professional time and outside fees.
- Changes and construction duration. Redesign after approval and a longer building programme can increase hourly charges, site visits or contract-administration fees.
Ask before you accept a quote
- Which stages, drawings, survey work and revision rounds are included?This distinguishes a drawing package from a complete design service and reveals charges needed before work can start.
- If the fee is a percentage, what construction-cost figure is it applied to?Confirm VAT, client-supplied items, minimum fees and what happens when the build budget changes.
- How are design changes and extra construction months charged?Ask for hourly rates, visit allowances and written approval before additional work.
A practical way to control the cost
Give each practice the same brief and construction budget, then approve a clear design before technical drawings start; late layout changes can require several consultants to revise their work.
Frequently asked questions
What happens at each stage of a project?
The plan of work runs from the brief, through concept design, into developed and technical design, then construction and handover. The planning application usually goes in after concept, and the building regulations package comes later. Be clear which stages you are appointing for, since a great many homeowners stop after consent and hire a builder directly.
When does a project legally need an architect?
There is no law requiring an architect for a house project. Anyone may design a building and submit a planning application. What is protected is the title, not the work. Whether you need one is a judgement about complexity: an awkward site, a listed building or a contested planning history is where the fee pays for itself.
Is structural engineering part of the fee?
Structural engineering is a separate appointment and a separate fee. Beams, foundations and anything involving removal of a load bearing wall need calculations that building control will want to see. On a basement or a difficult site you may also need a geotechnical report. Ask who is appointing and coordinating those consultants.
How are architects' fees structured?
A proportion of the build cost, a fixed fee, an hourly rate, or fees set per stage of the plan of work. Get the fee broken down by stage so you can stop after consent if you choose. Ask what an additional service means in the contract, because reworking a scheme after a planning refusal often is one.
Who owns the drawings when the job ends?
Copyright rests with the architect unless the appointment says otherwise, and you receive a licence to use the drawings for the agreed purpose, commonly conditional on fees being paid. This matters if you part company after consent and want a different practice for the technical stages. Raise it when you sign, not when you leave.
Should I get a feasibility study before buying land?
Yes, especially on a plot with no consent. Planning history, local policy, access, drainage, trees with preservation orders, and whether the site sits in a conservation area or green belt all determine what you will be allowed to build. A pre application enquiry with the council alongside a feasibility study is the sensible order before you commit.