Best Civil, Structural and Environmental Engineers Near You

5,189 companies on file · 457 towns · 3,360 rated 4.5+ · 108 open 24/7

Data verified November 28, 2026

Top-rated in your area

We show companies for your area once your location is detected. Meanwhile, open an example such as Civil, Structural and Environmental Engineers in London, or browse by region.

HomeCivil and Environmental Engineers

Overview: Civil, Structural and Environmental Engineers

You bring in a structural engineer when the building work needs numbers behind it. Knocking a wall through between two rooms, opening the back of a house for bifold doors, converting a loft, underpinning after subsidence, or working out whether a crack in a bay is historic movement or something live.

What you get is a set of calculations and a sketch detail: the steel size, the bearing at each end, the padstones, and how the load reaches the ground. Building control wants those calculations before the steel goes in, and your builder wants them before pricing. A chartered engineer through ICE or the Institution of Structural Engineers carries professional indemnity cover, which is a large part of what the fee buys.

Civil and environmental work shades into planning: drainage design and sustainable drainage for a new dwelling, a flood risk assessment where the council asks for one, contaminated land assessment on a former industrial plot.

One boundary worth knowing. Work affecting a shared wall or close to a neighbour's foundations falls under party wall procedure in England and Wales, and that goes to a party wall surveyor, not to your engineer. Browse by region and town below.

Structural and civil engineering costs in the UK

Choose the engineering output your project needs: a defect report, structural calculations, drainage strategy or land-contamination assessment. These are professional fees; construction, testing and repair work are separate.

Job or serviceGuide priceScope
Inspect one structural concern and provide a report£550–£960per inspection and reportA visual inspection of one identified structural concern in an ordinary home, such as cracking or a suspect wall, with accessible areas and a written report.A focused report covers the specified concern. A whole-building structural survey or monitoring programme needs a separate scope.
Included and extra costs

Included: Site inspection; Written findings and recommendations

Extra or separately priced: Opening-up, monitoring and laboratory tests; Repair calculations or construction

Design one load-bearing wall opening£540–£800per opening designOne straightforward opening in a domestic load-bearing wall, designed with a steel beam and bearing details, including the engineer’s site visit and building-control calculations.Engineering fee only. Tell the engineer the opening width, supported floors and any unknown wall or foundation details.
Included and extra costs

Included: Site visit and structural calculations; Beam and bearing drawings/details

Extra or separately priced: Steel supply, installation and opening-up; Complex frames or new foundation design

Structural design for a single-storey extension£950–£1,700per design packageA straightforward single-storey rear or side house extension, with structural drawings and calculations for the agreed foundations, walls, roof and openings.Supply the agreed architectural scheme first. Unusual foundations, large frames or later layout changes can add fees.
Included and extra costs

Included: Engineering site visit; Structural calculations and drawings; Agreed building-control queries

Extra or separately priced: Ground investigation and trial pits; Architectural drawings and construction

Surface-water drainage strategy for one houseFrom about £840per planning strategyA calculation-backed surface-water drainage strategy for a straightforward house or extension, using supplied site and layout information to assess runoff, discharge and storage needs.Confirm the council’s requested outputs, maintenance plan and revision allowance. A basic screening note may not meet the same brief. Comparable providers publish starting fees for straightforward sites; surveys, discharge constraints and planning requirements determine the final quote.
Included and extra costs

Included: Runoff and storage calculations; Outline drainage solution and report

Extra or separately priced: Topographical survey and infiltration tests; Detailed construction design and approval charges

Phase 1 land-contamination desk study£835–£900per straightforward-site reportA Phase 1 desk study and preliminary contamination risk assessment for a straightforward small development site where the instructing authority accepts a desktop-only assessment.Desktop-only scope must be acceptable for the project. A site walkover or Phase 2 investigation may still be required.
Included and extra costs

Included: Historical and environmental information review; Preliminary risk assessment and report

Extra or separately priced: Site walkover and intrusive testing; Remediation design and construction

Phase 1 assessment with a site walkover£1,075–£1,150per report and walkoverA Phase 1 contamination assessment for an accessible, straightforward small site, combining desk research with a non-intrusive site walkover and preliminary risk report.Confirm travel and site coverage in the fixed fee. Any recommended sampling is a separate Phase 2 scope.
Included and extra costs

Included: Desk research and site walkover; Preliminary contamination risk report

Extra or separately priced: Boreholes, sampling and laboratory work; Remediation design or verification

What changes the price?

  • Required output. A visual opinion, signed calculations, planning strategy and construction drawings are different commissions.
  • Existing information and access. Missing measurements, opening-up, trial pits, surveys and restricted site access can add separate costs.
  • Complexity and third-party questions. Unusual structures, contaminated history or demanding approval conditions increase analysis and revision time.

Ask before you accept a quote

  • Does this fee include the visit, signed report or calculations, and the drawings the recipient needs?A component calculation or informal visit may not deliver the complete submission.
  • Which surveys, tests and outside fees must I pay for separately?Identify investigation costs before design starts, particularly for foundations, drainage and contaminated land.
  • How many revisions and authority queries are included, and what counts as a design change?This separates normal clarification from new chargeable work.

A practical way to control the cost

Send the same drawings, photographs and approval-condition wording to each engineer, and agree the design before calculations begin to reduce repeat design fees.

Approximate budgets for the work described, based on published UK prices. Prices include applicable VAT unless a row says otherwise. These are guide figures, not quotes from the listed businesses.

Frequently asked questions

When do I need an engineer, not a contractor?

Whenever load is being moved. Taking out a wall between kitchen and dining room, forming a wide opening at the rear, cutting into roof structure for a loft conversion, or dealing with subsidence. Builders can price the steel, but building control wants calculations from someone qualified to produce them, and your builder will ask for the same.

What happens on a structural assessment visit?

The engineer looks at the crack inside and out, checks whether it is tapered and where it runs, opens up a trial pit if the foundations are in question, and asks what changed nearby. Trees, a leaking drain, an extension built years ago. Much movement turns out to be old and stable, and saying so is a legitimate outcome.

Who is allowed to seal the drawings?

There is no seal in the North American sense. Building control accepts calculations from a competent engineer, and chartered status through the Institution of Structural Engineers or ICE is the usual evidence of that. Confirm the individual is chartered and that professional indemnity cover is in place, since the cover is what backs the design.

Why is the engineered fix heavier than expected?

Because the engineer is liable and insured for the design. Where the existing structure cannot be seen, assumptions go the cautious way, and that shows up as a deeper steel or an extra padstone. Paying for a trial hole or lifting a few floorboards first often brings the specification down more than the investigation costs.

What is an environmental site assessment?

A desk study of past uses, historic maps and landfill records, followed by intrusive sampling only where that raises a concern. Councils commonly attach a contaminated land condition to planning permission on a former industrial or garage site, and discharging that condition is what the report is for.

Browse by region

Top towns

How we build this list

No one pays to be hereNo business pays us. A listing, a higher spot or a Best of award cannot be bought.
Checked before listedPermanently closed businesses, call centres posing as local trades and duplicate branches are kept off our pages.
Real customer reviewsEvery review was left by a customer on the company's public listing. We write none and accept none from businesses.
Rechecked every seasonEvery listing is checked again about every three months, once a season: hours, phone, website, reviews.
Is this page useful? Yes
No
Is there anything wrong with this page?
Back To Top